high slump loss resistant
time loss in collapsed slump
Water loss through winter
separated metering through time
summit time low tide time and flat time of electric usage
loss of bit load with loss return
extension of visible veins through all the bars through to the nail
Half Through or Through Arch Bridge
through and through suture
actual time over standard time
corrected retention time corrected retention time